In music, the USTM uses a conceptual model of a wetland system that includes two cells; an inlet pond followed by the main wetland or macrophyte cell. Stormwater can bypass the whole system when it falls below ("Low Flow Bypass") or exceeds ("High Flow Bypass") the predefined flow rates. The macrophyte cell has a permanent volume of water, with a low flow outlet pipe, whose invert is notionally set at the standing water level of this permanent pool. An overflow weir is located at an elevation equal to the extended detention depth above the standing water level of the permanent pool. A conceptual diagram of the wetland properties in music is presented below.
Conceptual diagram of wetland properties.
Wetland Properties
The initial wetland properties dialogue box contains the parameters that describe the basic physical characteristics of the wetland system:
...
When the stormwater inflow rate exceeds the user-defined High Flow Bypass amount, only a flow rate equal to the High Bypass Flow (less than specified in any Low Flow Bypass) will enter and be treated by the wetland. All of the stormwater flow in excess of the High Flow Bypass amount will bypass the wetland and will not be treated by the wetland.
Info | ||
---|---|---|
| ||
Tip Box The Low and High Flow Bypasses are assumed to occur simultaneously. So for a Low Flow Bypass of 2m3/s, a High Flow Bypass of 8m3/s, and inflow of 10m3/s: |
Inlet Pond Volume
The inlet pond volume in wetland systems provides a pre-treatment of the stormwater prior to its discharge into the macrophyte cell of the wetland. Pre-treatment of stormwater discharging into the wetland includes sedimentation of coarse to medium-sized particles and hydrologic control by facilitating a by-pass of flow around the macrophyte zone when the water level in the macrophyte zone has reached its maximum extended detention depth. Music models the performance of these pre-treatment functions using the inlet pond volume, assumed to be a permanent pool and defined, as the principal parameter. Estimate inlet pond volume feature has not been offered at this stage.
...
Defines the equivalent diameter of the outlet pipe (this may not be the diameter of the pipe itself, but the equivalent diameter of its orifices). The outlet pipe is notionally set with an invert at the standing water level of the permanent pool. The wetland dialogue box will display the notional detention time, based on the wetland volume, and the Equivalent Pipe Diameter.
Info | ||
---|---|---|
| ||
Tip Box Use the Notional Detention Time display to check whether the designed wetland properties (volumes and Equivalent Pipe Diameter) give approximately the required detention time. For more information, refer to Wong et al. (1998). |
Overflow Weir Width
Defines the width of the overflow weir for the main wetland pond. The overflow weir will only start to carry a discharge of water once the depth in the pond reaches the Extended Detention Depth defined above.
...
Sediment Storage Volume Requirement
Volume requirement according to sediment loading (which is the Contributing Catchment Area*Capture Efficiency*Sediment Loading Rate*Clean Out Frequency).The required volume of sediment storage (S) can be estimated using the Equation below:
S = Ca x R x Lo x Fr
Where, S = volume of storage required (m3)
Ca = contributing catchment area (ha)
R = capture efficiency (%)
Lo = sediment loading rate (m3/ha/year)
Fr = desired cleanout frequency (years)
Permanent Pool Volume Requirement
...