Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Operations support for Minimum Flow Requirement Nodes

  • The Required Flow (previously Required Water) on Minimum Flow Nodes can be overridden.
  • More of the recordable values in Minimum Flow Nodes can be viewed in the Operations Tabular Editor
  • Operations Forecast Scenarios can be defined

...