Anchor | ||||
---|---|---|---|---|
|
...
- The main window can be maximised or minimised using controls at the right hand end of the title bar;
- A menu bar with familiar File, View and Help menus. Additional menus direct you to more specific functions of Source; and
- Toolbars providing point-and-click access to many commands.
Figure 1. User interface for Source
The following toolbars (available from the main Source screen) allow you direct access to various sections of Source:
- Data Sources toolbar - allows you to add and manage sources of data (time series or by linking to another scenario). You can edit or view this data once it has been loaded in the Data Sources Explorer;
- File toolbar - allows you to create a new project, opening an existing project, and saving a project (and all the scenarios within that project);
- Function manager toolbar - allows you to add and manage all functions in Source;
- Ordering toolbar - provides quick access to ordering-related functions. The button on this toolbar reveals a pop-up menu;
- Project toolbar - allows you to toggle view of the Project Explorer, Recording Manager, Log Reporter and Chart Recording Manager;
- Recording Manager toolbar - allows you to manage results in the Recording Manager;
- Scenario toolbar - allows you to hide or display the Geographic Editor, Schematic Editor and Tabular Editor, the Function Manager, Data Sources, the Node Palette, the Layer Manager and Location Control panels; and
- Simulation toolbar - allows you to set the analysis type (single, stochastic or flow calibration), specify start and end dates for the simulation, and to run the catchment model.
...
Figure 7. Notes, Overview
If a note can be added to an item, when you right-click on the item the option Add Note will be available from the context menu, refer to Adding notes to nodes and links. The exception is adding notes to a function, which is done using the Add/Edit Note icon in the Function Editor toolbar, see Adding a note to a function.
A summary of all the notes configured in a scenario can be viewed using View » Notes. For the example shown in Figure 8, the First inflow andDam nodes, the $AllocGS function and the Default Link #1 link have notes associated with them.
...
Once a scenario containing notes has been run, the notes are listed in the log reporter with a message type of Note. Also listed is the notification level, the name of the associated item (eg. Inflow 1) and the text message. Furthermore, the Schematic Editor shows all the nodes and links that have notes configured on them. Figure 9 shows two nodes with informational notes, one with a warning note, and one error note.
...
Figure 10. Identifying active windows
The windows of some tools may be docked in the main window.
Windows can be reset with View » Reset All Windows.
HotKeys
A keyboard shortcut, also known as the hotkey, is a series of one or several keys to provide an alternate way to do something typically done with without a mouse.
In Source, some hotkeys, which are specified only for the user interface of Results Manager only , are described in in Results Manager-HotKeys.
In other user interfaces of Source, hotkeys are also developed, commonly in three types, to activate the task without a mouse:
(a)Directly use the hotkey after menu items such as as Ctrl+F (that is the same as clicking on the menu menu Tools>>Find Node/Link) to find a specific node/link, F5 (that is the same as the menu menu Run>>Run) to run the model. This type of hotkeys on the main interface are listed in Table 1.
TABLE 1. HotKey list for the main Interface
Action | Shortcut | Full Description |
---|---|---|
New >>Scenario | Ctrl+N | Display Create a scenario screen for creating a new scenario |
Open | Ctrl+O | Display the Open Dialog Box for opening a Source project file |
Save | Ctrl+S | Save the Source project file |
Ctrl+P | Print the file | |
Exit | Alt+F4 | Close the Source project file |
View>>Results Manager | F10 | Open the Results Manager screen |
Configuration | F6 | Open the Configure interface |
Run | F5 | Run the current scenario |
Tools>>Find Node/Link | Ctrl+F | Open the search screen to find a node or link by name |
(b)Using the the Alt key key to trigger or navigate or trigger the tasks from the menu items on the user interface:
- Hold the the Alt key key to explore which letter has the underscore, such as View from from the main Interface, and then press that letter ((e.g. V) until the task is triggered. For example, Alt+V+R is to open the user interface of Results Manager. This action is the same as clicking on the menu View>>Results Manager or direct use of a hotkey F10.
- Hold the the Alt key key to explore which letter has the underscore, such as as Edit from from the main Interface, and then press that letter (e.g. E) until the task item (e.g. Trade Manger) is displayed without hotkey or multiple uses of the same letter, but the task item is without any underscore letter or with an underscore letter (e.g. ALT+E+P) used in multiple tasks. The user needs to release the Alt key, move the cursor (by the arrow keykeys) to the task item and press the the Enter key key to trigger the task.