...
Setting up the Urban Settings is specified here as the second step in a three-step process of configuring and running an Urban Demand Scenario (Figure 1), since common default Urban Settings are available to be used when building the nodes. However, if e.g. new end-use patterns water consumption parameters are being specified then these should be allocated prior to the node configuration so that they are available for node configuration.
...