Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

The relevant Functional Unit area should be equal to the maximum irrigated area plus any undeveloped area. The Undeveloped Area is then calculated internally by Source as the difference between the Functional Unit Area and the Maximum Irrigated Area.

The three routing parameters Ts, Tq and Vs in the Rainfall-Runoff table are only enabled if Enable Linear Storage Routing is toggled on.

Image Added

Exceptions

Soil moisture capacity is entered as a parameter in the Rainfall-Runoff Model table, and has been deactivated at the Irrigator Demand Model interface.

...