The main considerations in assembling the stormwater treatment train are:-

Determining pollutant characteristics
Identifying appropriate treatment processes
Selecting the appropriate treatment sequence
Evaluating the site constraints

 

Figure 1 shows the various management issues associated with the pollutant characteristics and corresponding appropriate treatment processes as depicted by Breen (1999).

...

It should be noted from examination of Figures 1 and the figure shown in introduction+to+treatment+stra>Introduction to Introduction to Treatment Strategies that:-

Stormwater treatment requirements need to match the limitations of treatment processes
Target pollutants have a large size range
Different treatment processes operate in different particle size ranges
Different treatment processes operate over different time and hydraulic load

 

Treatment sequence

The appropriate treatment sequence in managing urban stormwater should commence with the removal of gross pollutants, then progress downstream to coarse material, and finally address fine and soluble contaminants. The space requirements are influenced by the operating hydraulic loading range of the selected treatment measure (see introduction+to+treatment+stra>Introduction to Introduction to Treatment Strategies), which ranges from 1,000,000 m/yr for gross pollutant traps to 10,000 m/yr for swales and ponds to as little as 10 m/yr for bioretention systems.

...

As the operating hydraulic loading range of a treatment measures decreases, there is a need for either:-

more area for treatment (for example a wetland will take up more room than a GPT)
more strategic placement of treatment measures
location nearer to source
several measures distributed throughout the catchment.

 

There is, however, an optimum hydraulic loading below which many treatment measures will have a reducing benefit/cost ratio.

...

Treatment effectiveness of many measures:

decreases with increasing inflow rates
increases with increasing inflow pollutant concentration
pre-treatment improves the treatment effectiveness of most facilities (a wetland, for example, should have some form of gross pollutant treatment upstream).

 

Hydrologic Control

Most treatment measures require some form of hydrologic control to operate in the optimal hydraulic load range. This will involve:

flow diversion
flow attenuation and regulation
isolation or separation of runoff from different sources, eg. infiltration of roof runoff.