...
Rating curves (Figure 4) are used to describe the physical characteristics of the reach and convert a flow into a level, ie. they produce an output of level. They can be specified in one of two ways:
- Using the Cross Section Editor to specify a physical cross section, and then generating the rating curve; or
- Directly entering the rating curve - the piecewise linear editor allows you to define relationships with respect to water level, discharge rate, reach width and dead storage. You can define multiple rating curves for a reach, each scheduled to commence on a particular date.
...
- Right click Rating Curve and choose Add Rating Curve;
- Today’s date will automatically be entered for Start Date. To change this, click the calendar on the right side (see Working with date-pickers);
- Enter the water level, discharge rate, reach width and dead storage; and
- Enter an appropriate value for Overbank Flow Level.
Jira Legacy showSummary false server JIRA serverId c4ca6e0f-9f42-3d1a-879c-870abe699ab1 key RM-14731
...
Ownership must be enabled at the scenario-level (using Edit » Ownership) prior to configuring ownership at storage routing links. Refer to Ownership for details.