Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Edit through the REST API

...

Rating curves (Figure 4) are used to describe the physical characteristics of the reach and convert a flow into a level, ie. they produce an output of level. They can be specified in one of two ways:

  • Using the Cross Section Editor to specify a physical cross section, and then generating the rating curve; or
  • Directly entering the rating curve - the piecewise linear editor allows you to define relationships with respect to water level, discharge rate, reach width and dead storage. You can define multiple rating curves for a reach, each scheduled to commence on a particular date.

...

  • Right click Rating Curve and choose Add Rating Curve;
  • Today’s date will automatically be entered for Start Date. To change this, click the calendar on the right side (see Working with date-pickers);
  • Enter the water level, discharge rate, reach width and dead storage; and
  • Enter an appropriate value for Overbank Flow Level.
    Jira Legacy
    showSummaryfalse
    serverJIRA
    serverIdc4ca6e0f-9f42-3d1a-879c-870abe699ab1
    keyRM-14731

...

Ownership must be enabled at the scenario-level (using Edit » Ownership) prior to configuring ownership at storage routing links. Refer to Ownership for details.