Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

There is an option to re-use water from any treatment node that has a permanent pool volume, plus the infiltration system node, by specifying a demand:

Image RemovedImage Added

The Max Drawdown height specifies the water level allowed for re-use, starting from the top. For example:

...

  • Defined as an annual demand (ML/yr) and scaled according to the daily Potential Evapotranspiration data contained in the Meteorological Template used to create the model;
  • Defined as an annual demand (ML/yr) and scaled according to the daily PET value minus the daily rainfall data contained in the Meteorological Template used to create the model rainfall (i.e. when PET exceeds rainfall, reuse will occur);
  • Defined as a daily demand (kL/day);
  • Defined as annual demand (ML/yr) and scaled according to a user defined distribution; or
  • Defined through the use of a user defined time series.

To edit the user defined distribution of the annual demand, select the Image Removed button. The graphical editor shown below allows the user to edit the percentage of the annual demand for each month.

Image Removed

...

  • .

...

To enter a user defined timer series, either type in the file path and file name, or   click on the Browse button, to locate a previously prepared comma separated value (CSV) file which contains the reuse rate (in L volume per time-step). The re-use file must be a CSV file with a separate reuse value on each line. The time-step for the reuse file must be the same as that used in the meteorology template file. Only a single column of data should be provided in the CSV file. A header row may also needs to be incorporated or may be left blank.

Demand will only be met when there is available storage in the permanent pool of the treatment node.

...

As discussed above, a user defined time series of reuse can be specified in music using Custom Demand Tab and importing data. This facility provides a more realistic reuse demand specification capability. The facility also allows exploration of the impacts of reuse that could not previously be simulated, such as trends in household demand, steps in demand as occupancy changes, etc.

The user defined reuse file can be specified by selecting the "Image Removed" button or by pasting the file address in the text box. The re-use file must be a CSV file with data separated line by line. The time-step for the reuse file must be the same as that used in the meteorology template file. A single header row should be incorporated.

The following provides examples of a suitably formatted user defined reuse file:

Image Removed

Image Removed

If an insufficient number of reuse values is specified in the reuse file, a reuse value of 0 will be applied for all subsequent time-steps. If too many reuse values are provided in the reuse file, the additional reuse values will be truncated. In either circumstance a warning message will be issued advising how many unassigned/truncated values there are in the reuse file.