Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 9 Next »

The node connection rules are based on the link type allowed between each node output and input. When you draw links between outputs and inputs, the UD plugin will prevent you from configuring the links to join incompatible inputs and outputs together.

In the Node Model detailed descriptions, each node model input and output has a link type listed. The table below summarises these connection rules in one place.

To use this table, look up the originating node in the left-most column, then the output you want to connect (the destination node).

Example: from a roof node, you can connect the runoff output to a buffer, but not the runoff to tank output.

This table shows the allowed connections between a source node, and a destination node. The Destination node column specifies which output of the source node can connect to the nodes below it. If a node is not listed in the Destination Node column, the connection is not permitted. For example, the Roof node's Runoff to Tank output can connect to a Tank node's Rainwater / Stormwater Tank inflow, but not an Average Water Use node's Rainwater / Stormwater inflow.

Node IconOrigin Node Name

Output


Destination Node - destination input type(s)


Roof

Runoff to Tank

Tank - Rainwater / Stormwater **
Bypass RunoffTank - Rainwater / Stormwater **

Tank

Demand

Average Water use - Mains, Rainwater Tank, Alt. Supply 1, Alt. Supply 2

Behavioural Water use - Mains, Rainwater Tank, Alt. Supply 1, Alt. Supply 2

Average Water use


Behavioural Water use

Greywater

Tank - Rainwater / Stormwater **
BlackwaterTank - Rainwater / Stormwater **
Irrigation/OtherTank - Rainwater / Stormwater **

** Recycled Water is also available in the User Interface, but is not currently connected for the Tank node

User Interface

Figure 1 illustrates the connection combinations available on a Runoff link between a Roof node (origin) and a Tank node (destination). 

A Runoff to Tank Rate and a Bypass Runoff Rate are output from a Roof node. These are mapped to a Tank node via the Runoff link between the Roof node and a connected Tank node.

Multiple connection combinations are supported by using the Add button.


  • No labels