Note: This is documentation for version 5.16 of Source. For a different version of Source, select the relevant space by using the Spaces menu in the toolbar above

Node Connection Rules

The node connection rules are based on the link type allowed between each node output and input. When you draw links between outputs and inputs, the UD plugin will prevent you from configuring the links to join incompatible inputs and outputs together.


In the Node Model detailed descriptions, each node model input and output has a link type listed. The table below summarises these connection rules in one place. This table shows the allowed connections between a source node, and a destination node.

To use this table, look up the originating node in the left-most column, then the output you want to connect (the destination node).

The Destination node column specifies which output of the source node can connect to the nodes below it. If a node is not listed in the Destination Node column, the connection is not permitted. For example, the Roof node's Runoff to Tank output can connect to a Tank node's Rainwater / Stormwater Tank inflow, but not an Average Water Use node's Rainwater / Stormwater inflow.

Node IconOrigin Node Name

Output


Destination Node - destination input type(s)


Roof

Runoff to Tank

Tank - Rainwater / Stormwater **
Bypass RunoffTank - Rainwater / Stormwater **

Tank

Demand

Average Water use - Mains, Rainwater Tank, Alt. Supply 1, Alt. Supply 2

Behavioural Water use - Mains, Rainwater Tank, Alt. Supply 1, Alt. Supply 2

Average Water use


Behavioural Water use

Greywater

Tank - Rainwater / Stormwater **
BlackwaterTank - Rainwater / Stormwater **
Irrigation/OtherTank - Rainwater / Stormwater **

** Recycled Water is also available in the User Interface, but is not currently connected for the Tank node

User Interface

Figure 1 illustrates the connection combinations available on a Runoff link between a Roof node (origin) and a Tank node (destination). 

A Runoff to Tank Rate and a Bypass Runoff Rate are output from a Roof node. These are mapped to a Tank node via the Runoff link between the Roof node and a connected Tank node. Runoff to Tank and Bypass Runoff are both outputs from the Roof node, with their relative amounts determined by the Percentage of Roof Connected to Tank option in the Roof node interface.

Multiple connection combinations are supported by using the Add button.

Figure 1. Runoff link interface


Figure 2 illustrates the connection combinations available on a Demand link between a Tank node (origin) and a Water Use node (destination). The configuration of this link will provide water to each end-use on the Water Use node, according to the priorities set at the node.

Multiple connection combinations are supported by using the Add button.

Figure 2. Demand link interface