Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

    1. Evaluate functions and modelled variables - where Time of Evaluation equals Ordering Phase and where the function is not used at a network element
    2. Process Water Users:
      1. Per Water User:
        1. Evaluate functions and modelled variables - where Time of Evaluation equals Order Phase, and where the function is used at this Water User.
        2. Calculate and distribute the demands of each Water user
    3. Constraint Phase:
      1. Per Network Element:
        1. Calculate minimum and maximum constraints at each element and pass the constraints downstream
    4. Ordering Phase:
      1. Per Network Element:
        1. Evaluate functions and modelled variables - where Time of Evaluation equals Order Phase, and where the function is used at this network element.
        2. Calculate regulated orders and pass upstream
        3. Calculate off allocation orders and pass upstream
  • No labels