Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Info
iconfalse

Tip Box

This simple example may help to explain the specifications for buffer strips. If a Source Node with an impervious area of 100 ha has buffer strips applied to 20 ha, and the buffer strips occupy 5 ha of land:

Percentage of Upstream Impervious Area Buffered = 20%

Buffer Area = 5%


It is possible to  view or save various  inflows, outflows, water quality for the Swale.

You need to select them to record before you run. 


Buffer Node can be edited via Feature Table Buffer node display on Feature Table shown below:


Image Added