...
Info | ||
---|---|---|
| ||
Note: Some actions are similar to those performed for nodes. Refer to Renaming nodes and links, Searching for nodes and links, Deleting nodes and links, Node and link default names and Copying and pasting to achieve the relevant outcome for links. |
...
You can also drag the link vertically once it has been created by clicking on the red dot. This appears in the centre of the link when you click on the link. For more detail on the wetland link, refer to Wetland Link.
Dragging links
You can disconnect and reconnect a link between nodes rather than having to delete and re-add it using the Allow Link Dragged button in the Schematic Editor options toolbar. Note that not all links can be connected to all types of nodes, and specific nodes require certain links. Refer to Types of link routing for more detail.
...
To edit link parameters using a feature editor, refer to About feature editors.
Info | ||
---|---|---|
| ||
Note: You can also toggle the view of specific links that join certain types of nodes. Refer to Schematic Editor options toolbar for more detail. |
...
- Right click Rating Curve and choose Add Rating Curve;
- Today’s date will automatically be entered for Start Date. To change this, click the calendar on the right side (see Working with date-pickers);
- Enter the water level, discharge rate, reach width and dead storage; and
- Enter an appropriate value for Overbank Flow Level.
...