Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Migrated to Confluence 5.3

Introduction

...

The following assumptions are made when an EDM is configured in Source:

  • Water requirements are not additive - A basic assumption used in the EDM is that environmental water is not consumed and, as such, flow rule water requirements for more than one environmental asset can potentially use the same water in accounting for the success of their flow rules being met. For example the minimum flow requirement for fish passage is not necessarily a separate parcel of water from the minimum flow required to prevent an algal bloom;
  • Flow rules can be co-dependent: A flow rule can be conditionally contingent on another flow rule also being met;
  • Flow rules should only be attempted if their requirements are likely to be met: the EDM determines the daily demand, however before passing the demand for a day, the EDM checks to see if the total water required to complete the rule is available; and
  • The highest priority environmental water demand is for environmental flow rules which have commenced but not yet completed. If an environmental flow rule has started to be met, then the continuation of meeting this flow rule requirement has precedence over commencing water ordering to meet a new flow rule.

...