Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

eWater is pleased to release Source 5.50, which captures improvements and enhancements from May 2024 to October 2024, key activities include:

  • Replicate runners Runner functionalityFive more Functional units for WA

  • More Objective Function options

  • Farm Dams Node - Activation Date

  • Other enhancements and bug fixes

Replicate

...

Runner:

This functionality includes:

Improvements to this functionality includes bug fixes as well as enhancements.

The way leap years are handled by the replicate runner has been defined:

  • If the model run date is a leap year and the replicate data is also a leap year, the original value on 29 February is assigned to 29 February for the model run

  • If the model run date is a leap year and the replicate data is not a leap year, the average of 28 February and 1 March is assigned to 29 February

  • If the model run date is not a leap year and the replicate data is a leap year, the original value in the replicate data on 29 February will be ignored in the model run

Replicate Runner results are now supported when calculating Annual Descriptive Statistics in Results Manager. Results can be summarised by scenario as well as by selected sub-runs within scenarios.

...

Objective Functions:

Four new objective functions been added to Source Calibration functionality and also to the statistics available in Source Results Manager. These include the Kling-Gupta Efficiency (KGE) statistic and three versions of a statistic proposed by Trotter et al (2023) which is an adaptation of the KGE to address the tendency of KGE (and NSE) to preference matching high flows:

...

Onstream Farm Dam node activation date:

An activation date option has been added to the Onstream Farm Dam node editor. This allows the user to better model farm dams which are built partly through a model run.

...

Enhancements &. Bug Fixes

Other enhancements and bug fixes include:

Linked to wrong SRG and Help in one item of Water User Node. A review was done to identifybroken links from node/links UI components to the Source User Guide and the Source Scientific Guide. These were fixed.

off allocation / accounts --> remaining capacity recorder. After consultation it was decided to delete this recorder

The old data set still used in model run although the data files have been updated in Data Sources. Identified as not a bug

Disabling gauged releases stops model run. Identified as not a bug but what we expect to happen according to the usage rules of Data Sources

Error message "Values have to be monotonically increasing" is ambiguous. Generic message updated to include the name of the relevant component (e.g. the gated spillway)

Data Input - csv reader handles apostrophes in headers badly. Fixed

Rename "Carryover next year trigger total". Issues with the recorder name have been clarified

Issue with account sharing within water user nodes. Fixed

Users should not be allowed to delete triggers in Continuous Accounting Resource Assessment. Fixed

Showing an error when clicking on down arrow for filter -if there are no overrides. Tabular editor: Fixed

Error comes up in Dora when running a simple project. Fixed

Fall phase issue - Inconsistent behavior. Environmental Flows: Fixed

Trend Forecast Model: Change the default forecast timestep to 'Previous'. Fixed

Use TOL to fill min reserves before borrowing. After consultation it was decided that the current behaviour is acceptable

Regression testing

There is no tolerance in our regression test suite to allow for earlier identification of results being different on different machines or versions of operating systems. 

See: 5.40 50 Regression Test Changes

Full release documentation

https://ewater.atlassian.net/issues/?jql=project%20%3D%20Source%20AND%20fixVersion%20%3D%205.50.0.13365